Our Engineers designed and supervised the manufacture of two 60 tonne (WLL) Co lifting beams to lift trains that had masses of 120 tonne. The co lifting beams were adjustable so that trains with different widths and heights could be lifted safely via two overhead cranes in the workshop during the production process.